Facility
Commissioning
Group
158 Burt Road
Lexington, KY 40503
859.278.5552
859.278.6501 (Fax)

 
Home > Documents and Specifications
Home
Main
Process
Projects
Personnel
Consultants
Contact Us
References
Documents and Specifications
Certifications
Affiliations
Commissioning For LEED

 


 
The Commissioning Process
Find out how these documents and specifications are utilized in the commissioning process to ensure optimum performance.


 
Documents and Specifications

The following report forms are presented as examples of System Verification Checklists (SVC), Functional Performance Tests (FPT), Resolution Tracking Forms (RTF) and commissioning specifications. These forms are customized for each project to assure design intent compliance. The final content and test parameters are based on the Design Intent Documents (DID).

System Verification Checklists (SVC) (download all)

    Air Handling Units
    Exhaust Fans
    Hydronic Accessories
    Hydronic Pump
    Variable Air Volume Terminal (VAV)

     Lighting Controls
     Domestic Hot Water

Functional Performance Tests (FPT) (download all)

    VAV Air Handling Units
    Cooling Water Systems
    Heating Water Systems
    Lab Exhaust Fans
    Laboratory Room
    Variable Air Volume Terminal (VAV)

    Fan-Powered Variable Air Volume Terminal (VAV)
     Lighting Controls
     Domestic Hot Water

Resolution Tracking Form (RTF)

Sample HVAC and Electrical Commissioning Specification

Sample Fire Alarm Commissioning Specification

Sample Fire Protection Commissioning Specification

Sample Elevator Commissioning Specification

 

    Home | Main | Process | Projects | Personnel | Consultants | Contact Us | References | Documents and Specifications | Certifications | Affiliations | Commissioning For LEED