Phases of Commissioning
Pre-Design
Design
Construction
Acceptance
Post-Acceptance
Our Methods
Facility Commissioning Group bridges the gaps between the
Owner, the Design Team, the Construction
Team and Vendors using a process
employing:
Thorough review of design and
submittal documents
Review of Design Intent Document or
Owner's Project Requirements
Progress and coordination meeting
attendance
Site observations and site meetings
Resolution tracking forms
System verification checks
Start-up involvement for equipment
Functional performance testing
O&M and as-built documentation
corroboration
Specified factory service and
off-season mode testing enforcement
O&M training facilitation and
recording
Integration of subsystems to perform
as a cohesive system
Point of contact references for
warranty action
A final commissioning report
including an executive summary
Our Standards
Facility Commissioning Group corporate
standards derive from the most up to
date industry references available for
building systems commissioning. ASHRAE
Guideline 0 and the ACG Commissioning
Guideline serve as the basis for our
development of procedures and protocols.
Utilizing personnel who have earned
Commissioning Authority (CxA) and
Commissioning Technician (CxT)
certification assures that our clients
receive highly qualified professionals
succeeding at executing team approach
commissioning process.
ACG Commissioning Guideline
– 2005
ASHRAE Guideline 0-2005:
The
Commissioning Process
ASHRAE Guideline 1.1-2007:
The HVAC&R Technical Requirements
for the
Commissioning Process
ASHRAE Guideline 4-2008: Preparation
of Operating and
Maintenance Documentation
for Building Systems
NIBS Guideline 3-2006: Exterior
Enclosure Technical Requirements
for the Commissioning
Process
NECA 90-2004: Recommended Practices
for Commissioning
Building Electrical Systems
NETA - 2003 Acceptance Testing
Specifications
BICSI: Telecommunications Distribution
Methods Manual, 11th
Edition - 2006
NFPA 72: National Fire Alarm Code - 2007
USGBC LEED-NC Version 3.0 Reference
Guide - 2009
USGBC LEED 2009 for New Construction &
Major Renovations
Reference
Guide - 2006
Integrated M/E Design Building Systems
Engineering; Anil Ahuja;
The Austin Company - 1997
|